Northmont High School

Education

NORTHMONT HIGH SCHOOL

This project consisted of the construction of two separate buildings. The first is a 100,000 SF PK-1 Early Childhood Learning Center. It is located adjacent to an existing YMCA facility on a new site with multiple courtyards and an outdoor classroom. The other building is a new 270,000 SF 9-12 high school. The new school was constructed on an existing campus designed with modular classrooms and was constructed in four separate phases.
Client Northmont City Schools
Location Englewood, OH
Square Footage 270,000.00
Project Budget $51.4 Million
UH Geneva

Healthcare

UH GENEVA PHARMACY

The primary focus of the project is a new, larger compliant pharmacy space for mixing hazardous
chemicals, with strict temperature, pressure, and humidity control requirements. A new retail space is also included, along with an extended waiting room for the pharmacy and radiology to increase patient capacity.
Client University Hospitals
Location Geneva, OH
Square Footage 40,158.00
Project Budget $8.1 Million
UH Avon Cancer Center

Healthcare

UH AVON CANCER CENTER

A standalone two story building next to the existing UH Avon Health Center. Highlight areas of this building include a linear accelerator vault, CT room, 2nd floor Pharmacy operation, 2nd floor patient infusion bays, and an attention-grabbing front entrance featuring a bi-directional sloped curtain wall, and architectural metal panel façade.
Client University Hospitals
Location Avon, OH
Square Footage 40,158.00
Project Budget $18 Million
Cleveland Clinic Brunswick Emergency Department

Healthcare

CLEVELAND CLINIC BRUNSWICK EMERGENCY DEPARTMENT

New, freestanding emergency department was built on an existing site immediately adjacent to a Family Health Center that maintained continuous operation throughout the project. The building also required new site/civil work, parking and a helipad.
Client Cleveland Clinic
Location Brunswick, OH
Square Footage 40,000.00
Project Budget $5 Million
Summa Health System New West Bed Tower and Akron City Hospital Reno

Healthcare

SUMMA HEALTH SYSTEM NEW WEST BED TOWER AND AKRON CITY HOSPITAL

The New West Tower serves as Summa Akron City Hospital’s new main entrance. The tower houses operating rooms, birthing center and NICU and helped shift most of the hospital’s inpatient rooms from shared to private. The renovations focused on the Imaging Department and Surgery support.
Client Summa Health
Location Akron, OH
Square Footage 331,000.00
Project Budget $167 million
Butler Tech Bioscience Education Facility

Education

BUTLER TECH BIOSCIENCE EDUCATION FACILITY

This project involved the construction of a new $10.6 million, two-story, 32,000 SF state-of-the-art bioscience educational facility to accommodate 300 students. The building provides demonstration labs for dental, nursing, medical, exercise science, and healthcare education. The scope of work also included development of the 14-acre building site, including all site utilities and paving.
Client Butler Tech
Location Hamilton, OH
Square Footage 32,000.00
Project Budget $10.6 million

SAFETY

SAFELY, THE ONLY WAY TO WORK

Safety is the most important value in our company. It impacts everything we do and is the first consideration when we plan our work. Our motto says it all: Safely, the only way to work. Our entire team is passionate about ensuring that everyone onsite works safely and can return home at night.

Our award-winning safety program is designed to provide zero incidents, as well as a safe and healthy work environment for all of our employees, subcontractors and the general public. Our goal on every job is to ensure that all work is completed safely with appropriate tools, equipment and methods. This goal takes priority over project scheduling concerns.

Safety Icon